Monday, November 7, 2011
Bridging of the building to the road
The building has been bridged by a large curved concrete cast. This structure was tied back into the building by meeting at a floor level, this was used to not only provide an aesthetic appeal to the building, but also so provide shelter from people entering the drop off zone. The same structure is used at the opposite end for the same reason. No only does it create an effect for those walking underneath, but by placing cutouts through the cast cornet, a framing is formed for those viewing the New Parliament building.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment